Tag Archives: Seattle

Updated Pictures of Curved Rectangular Tube Steel Bio-Spheres Covered in Glass

See below for the most recent pictures of the curved steel bio-spheres in Seattle, WA. 750,000# and 1,050 pieces rectangular tube steel bent the easy way and a portion bent off-axis. Almost 8 miles of welding work and grinding was avoided because of Albina’s ability to bend a portion of the project. Almost NO correction was needed during fabrication or erection as the bends fit to the fixtures within 1/32nd of an inch!

Curved Steel Bio-Spheres Covered in Glass

Curved Steel Bio-Spheres Covered in Glass

Curved Steel Bio-Spheres Covered in Glass

Curved Steel Bio-Spheres Covered in Glass

Curved Steel Bio-Spheres Covered in Glass

Curved Steel Bio-Spheres Covered in Glass

Curved Steel Bio-Spheres Take Shape in Seattle, WA.

The erection of the curved steel spheres in Seattle, Washington was completed in April 2016. Over the summer, the team of contractors began the install of the glass enclosure over the steel bio-spheres. Check out the progression in the pictures below. As a reminder, Albina’s scope of work included approximately 750,000# and 1.050 pieces of rectangular tube steel bent the easy way and a portion bent off-axis. The material was bent to tight tolerances and bent to AESS standards. The amount of welds and grinding was significant, but thanks to Albina’s ability to bend portions of the project, a significant amount of welding and grinding was avoided. Almost NO correction was needed during fabrication or erection as the bends fit to fixtures (fabrication) within 1/32nd of an inch! Check back for more pictures as the project progresses!

Curved Steel Bio-Spheres Seattle, WA.

Curved Steel Bio-Spheres Seattle, WA.

Curved Steel Bio-Spheres Covered in Glass

Curved Steel Bio-Spheres Covered in Glass

Customer Quote of Appreciation for Steel Bending Quality

We always love to receive positive feedback from our customers when we meet or exceed their steel bending and fabrication needs.  Here is a recent quote of appreciation for some curved steel we provided for a project currently being erected in Seattle, WA.

“I would like to thank you and your team for your efforts on making this project a huge success. Because of your great workmanship  and  detail to meeting such tight tolerances, everything is fitting up in the field with no problems. In fact most everything in the field is fitting to +/-  1/8”. The erector is 85% complete with the erection and they are hanging the steel 2-3 times faster than they had anticipated with no problems. That is phenomenal. The on-site welding inspector told us that he has never seen anything fit so well with no problems in his lifetime.”