Albina recently completed 65,000# of
bent steel for a
curved span bridge that connects Los Angeles' Metro Universal City City Red Line Station to Hollywood. Albina bent the following
structural steel materials for the 400 foot, L-shaped bridge span bridge. 14” OD x .375” Wall bent down to a 60 ft radius 16” Od x .500” wall bent down to a 59 ft radius 17” Sch80 A106B smls bent down to a 59 ft radius 8.625” OD x .500” wall API-5L bent down to a 44 ft radius 8.625” OD x .625” wall API-5L bent down to a 202 ft radius The steel was fabricated by Thomson Metal Fab. Click her to read a recent article published in
Modern Steel Construction. [caption id="attachment_929" align="aligncenter" width="300"]

Pipe Bending for Hollywood Span Bridge[/caption] [caption id="attachment_930" align="aligncenter" width="300"]

Pipe Bending Ranging from 8.625"-17" OD Material[/caption]