Close
You have no items in your shopping cart.
Search
Back to All Blog Posts

Signature Curved Steel Sky Bridge at the Phil and Penny Knight Campus for Accelerating Scientific Impact

Signature Curved Steel Sky Bridge at the Phil and Penny Knight Campus for Accelerating Scientific Impact

We took our daughter to tour the University of Oregon this week and we were simply in awe of the amazing facilities and buildings on campus! Our tour started on Franklin Boulevard where the University broke ground in early March on the Phil and Penny Knight Campus for Accelerating Scientific Impact. Albina Co., Inc. bent 22" OD x 1" Wall Carbon Steel Pipe to a 105 foot center-line radius for a signature sky bridge that spans Franklin Boulevard and serves as a connector between campus and other U of O research facilities. The $225 million, 160,000-square-foot first phase is slated to open in early 2020.

Curved Steel Sky Bridge at the Phil and Penny Knight Campus for Accelerating Scientific Impact

Curved Steel Sky Bridge at the Phil and Penny Knight Campus for Accelerating Scientific Impact

Curved Steel Sky Bridge at the Phil and Penny Knight Campus for Accelerating Scientific Impact
Comments
Write a Comment Close Comment Form
*